Skip to content

Proposal for

ONGRID- KW(RESIDENTIAL)

Independent |  kW (Without energy storage)

PREPARED FOR:

PREPARED BY:
RIRVANA ENERGY
ADDRESS: HB COLONY,LAST BUSTOP
VISAKHAPATNAM-530022
EMAIL: sales@rirvana.com
Contact: 9052122888/9052622888

Brief introduction About Us

RIRVANA ENERGY started in 2019 with the goal to make solar simple. Today, we are  leading residential rooftop solar company with a nationwide sales and after-sales network. We have installed 100+ systems across 2 states in India. Only solar company in India that has raised equity funding from two of the worlds largest energy companies Schneider Electric & Total Energies

Complete Solar Solution:

 

We design, procure and install rooftop solar systems for homes and small businesses. We have dedicated and specialized teams for each and every function -sales, design, procurement, installation & after-sales service.

Highest Return On Investment

 

ROI OF 20% to 30% annually. Pays for itself in as less as 3 years We only use Tier 1 components procured from leading vendors All our systems are engineered and installed to global standards

Easy Ownership

 

  • We offer loans varying from 6 months to 3 years
  • Loan evolution & sanction are to change to is done digitally within a week

After-sales

 

  • Systems are monitored 24X7
  • We assure a turnaround time of 48 hours for service request any after-sales service requests

 

Steps To Transition To Solar With Rirvana Energy

 

Click here to see the how the RirvanaEnergy helps the customer Transition to solar

System price:         System size:    kW (Includes supply of all components and  installation

Description

 

Price

GST Rate

 

GST

PRICE

Total Price

Amount to be paid by the customer to RIRVANA ENERGY

 

13.80%

 

 

Central Govt Refund to Customer (Under National Subsidy Scheme)

(-)

 

 

 

 

 

 

 

 

Effective Cost of Ownership

 

Note: Quote valid for 10 days from date of Quotation generated. Structure with a height of 300 mm is included in the system price

Benefits

Optional Items

Description

Charges per kW

Total Charges

Elevated Structure – GI – 300mm up to 2-meter elevation on lower-end

2,000

 

Elevated Structure – GI – 2-meter to 3-meter elevation on lower-end

8,000

 

Extra Cabling If the building is more than 2 Floors(per floor)

1,000

 

Mono-crystalline Panels

6,000

 

 

Note:  Prices are excluding GST. 18% GST will be applicable on the above prices.


Difference Between Rirvana Energy & Other Competition

 

Specifications

RIRVANA ENERGY

Competitor

Completely Digitized Process

Yes

No

Presence

National

Local

Detailed Project Report Before Start of Work

Yes

No

Global Engineering Standards

Yes

No

Hidden Cost

No

Yes

Interest Free Financing

Yes

No

Net metering – Applications & Permits

Yes

No

After Sales Service

24X7

No

 

 

 

 

Next Steps

How to apply online for national portal solar subsidy –

 

  1. Customer needs to download Sandes App and register for OTP

 

Android link –https:/ play.google.com/store/apps/details?id=in.nic.gimkerala

 

Apple iOS link –https:/ apps.apple.com/in/app/sandes/id1517976582

 

  1. Customer registers on National Portal for Rooftop Solar and submits application for feasibility
  2. Customer reviews data and issues Purchase Order

 

  1. RIRVANA ENERGY will share a detailed project report for client approval

 

  1. Customer will receive feasibility approval from DISCOM via email. Intimate the same to RIRVANA ENERGY and sign the EPC contract
  2. RIRVANA ENERGY takes up installation as per the project plan

 

  1. Once installation is completed, the customer submits the details in the portal and applies for net meter
  2. After installation of net meter, the DISCOM will inspect and generate a commissioning certificate on the national subsidy portal
  3. Customer needs to submit bank account details through the portal. Subsidy amount will be directly credited to the customer.

 

Click here to play the above video

Rirvana Energy Payment terms –

INR 10,000 as Token Advance along with PO

95% prior to dispatch of material, on intimation that materials ready to dispatch. Material will be supplied on site within 10 working days of payment receipt.

5% Against installation

Timeline

Note:* Timelines for feasibility approval & Net Metering are dependent on the DISCOMs and RIRVANA ENERGY will not be held liable

Terms and Conditions

Key points

  • Price is valid for 10 days
  • Regular sloping roof mounting structure with 300 mm module clearance is included in the prices. AC cable length of 25 m is included in the price.
  • A detailed site survey needs to be done before   finalizing DPR.
  • In case the system installation requires components or quantities beyond what is included in the proposal, the prices may change. The customer will be informed in advance of the same
  • Project execution timeline will begin after DPR approval or advance receipt or feasibility approval, whichever is later
  • Final commissioning of the project depends on supply of net meter by the local DISCOM Customer is expected to clean the panels weekly to ensure optimum power generation.
  • Any delay in payments can cause delay in the project timelines and prices are subject to change at Rirvana Energy’s discretion

Exclusion(s)

  • Load extension, Name Change etc., for existing power meter is under customer scope. Additional cost due to super structure is not included in the total cost.
  • Additional cost due to cable length greater than 25m is not included in the total cost.

Check list For Claiming Subsidy

 

 

 

Sl. No

 

Document

 

To be collected from

 

1

 

Copy of work order

 

Customer

 

2

 

Photo of Bene ciary

 

Customer

 

3

 

Aadhar card of bene  ciary

 

Customer

 

4

 

Mobile number

 

Customer

 

5

 

Electricity bill

 

Customer

 

6

 

Invoice

 

RirvanaEnergy

 

7

 

Project commissioning report

 

RirvanaEnergy

 

8

 

Statement of expenditure

 

RirvanaEnergy

 

9

 

Joint inspection report

 

RirvanaEnergy

 

10

 

Net metering work completion & synchronization reports

 

RirvanaEnergy

 

Annexure: Technical Details

Annexure: Balance of Systems