Proposal for
ONGRID- KW(RESIDENTIAL)
Independent | kW (Without energy storage)
PREPARED FOR:
PREPARED BY:
RIRVANA ENERGY
ADDRESS: HB COLONY,LAST BUSTOP
VISAKHAPATNAM-530022
EMAIL: sales@rirvana.com
Contact: 9052122888/9052622888

RIRVANA ENERGY started in 2019 with the goal to make solar simple. Today, we are leading residential rooftop solar company with a nationwide sales and after-sales network. We have installed 100+ systems across 2 states in India. Only solar company in India that has raised equity funding from two of the world‘s largest energy companies – Schneider Electric & Total Energies
Complete Solar Solution:
We design, procure and install rooftop solar systems for homes and small businesses. We have dedicated and specialized teams for each and every function -sales, design, procurement, installation & after-sales service.
Highest Return On Investment
ROI OF 20% to 30% annually. Pays for itself in as less as 3 years We only use Tier 1 components procured from leading vendors All our systems are engineered and installed to global standards
Easy Ownership
- We offer loans varying from 6 months to 3 years
- Loan evolution & sanction are to change to is done digitally within a week
After-sales
- Systems are monitored 24X7
- We assure a turnaround time of 48 hours for service request any after-sales service requests
Steps To Transition To Solar With Rirvana Energy
Click here to see the how the RirvanaEnergy helps the customer Transition to solar
System price: System size: kW (Includes supply of all components and installation | ||||
Description |
Price | GST Rate
| GST PRICE | Total Price |
Amount to be paid by the customer to RIRVANA ENERGY |
| 13.80% |
|
|
Central Govt Refund to Customer (Under National Subsidy Scheme) | (-) |
|
|
|
|
|
|
|
|
Effective Cost of Ownership |
|
Note: Quote valid for 10 days from date of Quotation generated. Structure with a height of 300 mm is included in the system price
Benefits
Optional Items
Description | Charges per kW | Total Charges |
Elevated Structure – GI – 300mm up to 2-meter elevation on lower-end | 2,000 |
|
Elevated Structure – GI – 2-meter to 3-meter elevation on lower-end | 8,000 |
|
Extra Cabling – If the building is more than 2 Floors(per floor) | 1,000 |
|
Mono-crystalline Panels | 6,000 |
|
Note: Prices are excluding GST. 18% GST will be applicable on the above prices.

Difference Between Rirvana Energy & Other Competition
Specifications | RIRVANA ENERGY | Competitor |
Completely Digitized Process | Yes | No |
Presence | National | Local |
Detailed Project Report Before Start of Work | Yes | No |
Global Engineering Standards | Yes | No |
Hidden Cost | No | Yes |
Interest – Free Financing | Yes | No |
Net metering – Applications & Permits | Yes | No |
After Sales Service | 24X7 | No |

Next Steps
How to apply online for national portal solar subsidy –
- Customer needs to download Sandes App and register for OTP
Android link –https:/ play.google.com/store/apps/details?id=in.nic.gimkerala
Apple iOS link –https:/ apps.apple.com/in/app/sandes/id1517976582
- Customer registers on National Portal for Rooftop Solar and submits application for feasibility
- Customer reviews data and issues Purchase Order
- RIRVANA ENERGY will share a detailed project report for client approval
- Customer will receive feasibility approval from DISCOM via email. Intimate the same to RIRVANA ENERGY and sign the EPC contract
- RIRVANA ENERGY takes up installation as per the project plan
- Once installation is completed, the customer submits the details in the portal and applies for net meter
- After installation of net meter, the DISCOM will inspect and generate a commissioning certificate on the national subsidy portal
- Customer needs to submit bank account details through the portal. Subsidy amount will be directly credited to the customer.

Click here to play the above video
Rirvana Energy Payment terms –
INR 10,000 as Token Advance along with PO
95% prior to dispatch of material, on intimation that materials ready to dispatch. Material will be supplied on site within 10 working days of payment receipt.
5% Against installation
Timeline

Note:* Timelines for feasibility approval & Net Metering are dependent on the DISCOMs and RIRVANA ENERGY will not be held liable

Terms and Conditions
Key points
- Price is valid for 10 days
- Regular sloping roof mounting structure with 300 mm module clearance is included in the prices. AC cable length of 25 m is included in the price.
- A detailed site survey needs to be done before finalizing DPR.
- In case the system installation requires components or quantities beyond what is included in the proposal, the prices may change. The customer will be informed in advance of the same
- Project execution timeline will begin after DPR approval or advance receipt or feasibility approval, whichever is later
- Final commissioning of the project depends on supply of net meter by the local DISCOM Customer is expected to clean the panels weekly to ensure optimum power generation.
- Any delay in payments can cause delay in the project timelines and prices are subject to change at Rirvana Energy’s discretion
Exclusion(s)
- Load extension, Name Change etc., for existing power meter is under customer scope. Additional cost due to super structure is not included in the total cost.
- Additional cost due to cable length greater than 25m is not included in the total cost.
Check list For Claiming Subsidy
Sl. No |
Document |
To be collected from |
1 |
Copy of work order |
Customer |
2 |
Photo of Bene ciary |
Customer |
3 |
Aadhar card of bene ciary |
Customer |
4 |
Mobile number |
Customer |
5 |
Electricity bill |
Customer |
6 |
Invoice |
RirvanaEnergy |
7 |
Project commissioning report |
RirvanaEnergy |
8 |
Statement of expenditure |
RirvanaEnergy |
9 |
Joint inspection report |
RirvanaEnergy |
10 |
Net metering work completion & synchronization reports |
RirvanaEnergy |
Annexure: Technical Details